The culvert on Pongratz Road, between Tolke Road and Ardabeth Lane, is too small and often clogs. We are replacing the culvert with a larger metal pipe to improve water flow and allow fish to pass upstream.
The $450,000 project is paid for through the County's Road Fund.
The Pongratz Road bridge at Whitcher Creek, east of Tolke Road, is weight limited. We are replacing the wooden bridge with a concrete bridge that is able to support heavier vehicles.
The $800,000 project is paid for through the County's Road Fund.