Skip to main content

This open house was active from April 2-18, 2021. Information on this website may no longer be current. Email us for more information.

 

Pongratz Road culvert

The existing 18-inch culvert will be replaced with a 72-inch culvert for improved water flow.

"Culvert replacement plans"